DLA Piper
Workplace
![Office reception area](https://schuchart.com/wp-content/uploads/2019/01/DLA-Piper-FInal-12_sm.jpg)
ARCHITECT: Gensler
LOCATION: Seattle, WA
CLIENT: DLA Piper
SCHEDULE: 20 weeks
SIZE: 26,000 sf
A 26,000 sf corporate tenant improvement on floors 69 and 70 in the Columbia Center. Scope included the complete demolition of the walls, ceilings and flooring on both floors, the removal/modification of the existing MEP systems, modifications to the fire sprinkler systems and the replacement of the existing mechanical systems including 22 heat pumps. Build back included new finishes.