The Eastside Preparatory School TALI Hall

The Eastside Preparatory School TALI Hall

Eastside Preparatory School TALI Hall Ground Up Construction, Academic and Cultural ARCHITECT: Public47 Architects, LLC LOCATION: Kirkland, WA CLIENT: Eastside Preparatory School SCHEDULE: 15 months SIZE: 105,000 sf 105,000 sf new performing arts center for Eastside...
The Eastside Preparatory School TMAC

The Eastside Preparatory School TMAC

Eastside Preparatory School TMAC Ground Up Construction, Academic and Cultural ARCHITECT: Public47 Architects, LLC LOCATION: Kirkland, WA CLIENT: Eastside Preparatory School SCHEDULE: 10 months SIZE: 32,000 sf The student body at Eastside Prep has been consistently...
Chihuly Garden and Glass

Chihuly Garden and Glass

Chihuly Garden and Glass Ground Up Construction, Academic and Cultural Opening Press Release ARCHITECT: Owen Richards Architects LOCATION: Seattle, WA CLIENT: Center Art, LLC SCHEDULE: 9 months SIZE: 6,400 sf new + 20,400 sf renovation The project consisted of the...
The Bullitt Center

The Bullitt Center

The Bullitt Center Ground Up Construction LA Times ARCHITECT: The Miller Hull Partnership LOCATION: Seattle, WA CLIENT: Bullitt Foundation SCHEDULE: 15 months SIZE: 50,000 sf The Bullitt Center is the first urban building to satisfy all of its own energy, water and...
Bastyr University

Bastyr University

Bastyr University Ground Up Construction, Multi-Family ARCHITECT: CollinsWoerman LOCATION: Kenmore, WA CLIENT: Bastyr University SCHEDULE: 14 months SIZE: 50,300 sf This 50,300 sf LEED Platinum project consists of three-story cottage-style buildings, each with 12...